1
100%
u/Aggressive_Rush2357
3 days ago
:DDNerd: 🄳🄳 :DDNerd:
LI / AMLIF — the Falchani pilot is the next thing worth watching
The number that stands out in American Lithium’s September update is 88.7% lithium extraction from the Falchani test work. The 2024 preliminary economic assessment assumed 80%
Good improvement, but the testing method matters here
They used pilot equipment in a semi-continuous lab process. So this is encouraging early work, not confirmation that the full plant can keep delivering that recovery for months
The pilot is installed and operating in Lima. The plan is to process 6 to 10 tonnes of material over at least three months at target rates
There is quite a bit to learn from that run. Whether recovery stays consistent, whether the different stages work properly together and what happens when they stop testing individual equipment and run the whole process
Costs are the other part. More recovery is useful, but how much reagent and energy does it take to get it? What is the product quality like across the run? Any downtime or changes needed?
Those details would help put the recovery number into context
LI / AMLIF still has financing and permitting ahead, and future funding could dilute shareholders. The pilot does not solve those issues. It does give the company a chance to produce better technical data for the next study
The next useful milestone for LI / AMLIF is sustained recovery across the full pilot run, alongside product quality and operating requirements. Those results should give the next study a firmer basis than the earlier laboratory testing alone